Difference between revisions of "N156PK"

From 856wiki
Jump to: navigation, search
Line 2: Line 2:
  
 
Patrick has built an RV-6A.  The engine has been run, the paperwork submitted, and the DAR inspected the aircraft on Saturday, Nov. 15, 2008.  First flight, with test pilot Brad Ransom at the controls, occurred at 7:47am on 11/19/2008. You can see more about the project, including a video of the first flight, at Patrick's [http://www.flion.com/flionwiki/index.php5?title=Airplane website].
 
Patrick has built an RV-6A.  The engine has been run, the paperwork submitted, and the DAR inspected the aircraft on Saturday, Nov. 15, 2008.  First flight, with test pilot Brad Ransom at the controls, occurred at 7:47am on 11/19/2008. You can see more about the project, including a video of the first flight, at Patrick's [http://www.flion.com/flionwiki/index.php5?title=Airplane website].
 +
* Update: The 40 hour test period, Phase I, was completed on 2/4/09.
 
[[Image:1142.jpg]]
 
[[Image:1142.jpg]]

Revision as of 20:20, 11 February 2009

Patrick Kelley's RV-6A

Patrick has built an RV-6A. The engine has been run, the paperwork submitted, and the DAR inspected the aircraft on Saturday, Nov. 15, 2008. First flight, with test pilot Brad Ransom at the controls, occurred at 7:47am on 11/19/2008. You can see more about the project, including a video of the first flight, at Patrick's website.

  • Update: The 40 hour test period, Phase I, was completed on 2/4/09.

1142.jpg